Skip to main content
Maintenance of Approved Building Plans
IB/P/BC 2026-063
Effective Date:
       
Lytemods - ADU46
    Read More  
The Foothill Catalog Foundation
    Read More  
How the amount of the bond is calculated?

The bond is calculated based on the earthwork quantity, cost of drainage devices, and/or retaining walls per LABC 7006.5.7

    Read FAQ
When is a Covenant and Agreement for Anti Graffiti required?

When the customer decides not to use anti graffiti coating on the first 9 feet of the exterior of the building.

    Read FAQ
When will I receive my order to comply?

Each property owner of these buildings will be sent an order to comply. These orders will be sent accordingly based on the following priority:

    Read FAQ
Supplemental Correction Sheet Curtain Wall (2023 LABC)
PC/STR/Corr.Lst.037-2023
       
Commercial Accessibility Plan Check Correction List
PC/DAD/Corr.Lst.10-2020
       
Will the Certificate of Occupancy be mailed to me?

Yes, the clerical staff will mail it out once the inspector issues and turn it in for filing.

    Read FAQ
What are the requirements for a Plumbing application?
Plumbing Plan Check projects that qualify for ePlan must meet the following condition:

must

  • Plumbing systems for buildings of 4 stories or less and up to 5 sheets of riser diagrams.

 

    Read FAQ
Alternate Design Methodology for Unreinforced Masonry Buildings
IB/P/BC 2026-053
Effective Date:
       
Supplemental Plan Check Correction Sheet for Flood Hazard Specific Plan (2023 LABC)
PC/STR/Corr.Lst.054-2023
       
Supplemental Correction Sheet for Steel Frame Design (for 2011 Codes)
PC/STR/Corr.Lst.44-2010
       
What should I submit to LADBS for plan check and obtain a permit?

The documents required for submittal are:

    Read FAQ
Review for Renewal of Electrical Testing Laboratory Recognition
       
What are the requirements for a Tenant Improvement application?

 

    Read FAQ
Cover
    Read More  
Zoning
    Read More  
Contact Us
    Read More  
403
    Read More