How long does the evaluation process take?

The initial evaluation process will take about 2 to 4 weeks. The overall completion of the evaluation and approval depends on the applicant.

    Read FAQ
Minimum Info to be Shown on Grading Plans
IB/P/BC 2026-133
Effective Date:
       
Supplemental Plan Review Checklist No. 2 - Signs
PC/DAD/Corr.Lst.02-2026
       
How long a permit is good for? / When does my permit expire?

A permit is good for two years from the time the permit fees are paid. You will need to call for inspection at least once every 12 months, otherwise the permit expires.

    Read FAQ
Safety Test - Cabled Elevators Installed After October 25, 1998 Five Year (Group III and IV)
IN/EPV/Form03-2016
       
When is a roof nailing inspection required?

When all rough sheathing is in place and nailed.

    Read FAQ
Solar Zoning
       
DSCM DESCRIPCIÓN DE SERVICIOS
DSCM Matrix Public
       
Covenant and Agreement for Community Driveway Over Two or More Parcels (for 2026 Codes)
PC/STR/Aff.13B-2026
       
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
       
Do I need to be an engineer, contractor, or architect to submit an application for plan check?

No, an agent, homeowner, engineer, contractor or architect can submit an application. 

    Read FAQ
The equipment has not been built yet. Can you approve the design of the equipment?

No. The design of the equipment can be reviewed, but the approval can only be issued after satisfactory evaluation and testing of the equipment.

    Read FAQ
The Department of Building and Safety sent me a Notice of Hearing regarding someone else's property. Why did I receive this?

LAMC requires that notices are sent to other property owners that may be affected by the request when an appeal request is submitted to the BBSC. You may attend the hearing and are allowed to speak on any case on the agenda, by completing a speaker card on the day of the hearing. 

    Read FAQ
What are the requirements for a Fire Sprinkler application?

 

Fire Sprinkler projects that qualify for ePlanLA must meet one of the following conditions:

one

 

    Read FAQ
Plumbing Maintenance Certificate of Registration
       
July 2022 Newsletter
       
Senate Bill 9 Two-unit Development and Urban Lot Split
    Read More  
When do I need a Building permit?

See the Los Angeles Municipal Code (L.A.M.C.), Section 91.106.2 for when a Building permit is required.

    Read FAQ