How long does the evaluation process take?
The initial evaluation process will take about 2 to 4 weeks. The overall completion of the evaluation and approval depends on the applicant.
How long a permit is good for? / When does my permit expire?
A permit is good for two years from the time the permit fees are paid. You will need to call for inspection at least once every 12 months, otherwise the permit expires.
When is a roof nailing inspection required?
When all rough sheathing is in place and nailed.
Do I need to be an engineer, contractor, or architect to submit an application for plan check?
No, an agent, homeowner, engineer, contractor or architect can submit an application.
The equipment has not been built yet. Can you approve the design of the equipment?
No. The design of the equipment can be reviewed, but the approval can only be issued after satisfactory evaluation and testing of the equipment.
The Department of Building and Safety sent me a Notice of Hearing regarding someone else's property. Why did I receive this?
LAMC requires that notices are sent to other property owners that may be affected by the request when an appeal request is submitted to the BBSC. You may attend the hearing and are allowed to speak on any case on the agenda, by completing a speaker card on the day of the hearing.
What are the requirements for a Fire Sprinkler application?
Fire Sprinkler projects that qualify for ePlanLA must meet one of the following conditions:
one
Senate Bill 9 Two-unit Development and Urban Lot Split
When do I need a Building permit?
See the Los Angeles Municipal Code (L.A.M.C.), Section 91.106.2 for when a Building permit is required.