Skip to main content
Displaying 2581 - 2590 of 4519 results
What is the "Hillside Ordinance Area"?

Land designated as “Hillside Area” on the Department of City Planning Hillside Area Map (12.21A.17), which can be viewed on NavigateLA. The area where construction projects are subject to the “Baseline Hillside Ordinance."

Published:
    Read FAQ
What is the Department procedure to obtain a drainage easement through a neighbor's lot?

Please see Information Bulletin P/BC 2026-057 for details.

Published:
    Read FAQ
When do I need a soils report?

A soils report is needed for construction on a slope steeper than 3:1 (Horizontal:Vertical), excavations removing lateral support, when a structure cannot be designed per building code values, and/or for structures which do not conform to chapter 18 of the 2014 LABC.

Published:
    Read FAQ
When do I need a soils, a geology, or a combined soils and geology report?

A geology report is needed for development within an Alquist-Priolo Earthquake Fault Zone or a Preliminary Fault Rupture Study Area or for new onsite wastewater treatment systems (OWTS).A combined report is needed for projects in a Hillside Grading Area or where bedrock is encountered in addition

Published:
    Read FAQ
When do I need to file for a 3-day notification for excavation adjacent to a neighbor's property?

Please see Information Bulletin P/BC 2023-060 for a detailed explanation.

Published:
    Read FAQ
When do I need to post a grading bond?

A grading bond is required for projects with over 250 CY of cut or fill in a Hillside Grading Area.

Published:
    Read FAQ
When grading plans are reviewed by regular plan check or grading plan check?

A building plan checker reviews most grading plans. The grading plan checker will review grading plans for grading work in conjunction with an approved subdivision map or to issue grading permits to correct a hazardous soil condition per LABC 7005.7.

Published:
    Read FAQ
When will my bond be exonerated?

The district grading inspector will clear the release of the bond upon completion of the work. Financial Services will release the bond amount.

Published:
    Read FAQ
Where do I apply for a GPI?

A grading pre-inspection (GPI) can be applied for at the construction services center.

Published:
    Read FAQ
Where do I submit a grading plan?

Grading plans are submitted to the building plan checker at the construction services center.

Published:
    Read FAQ