Land designated as “Hillside Area” on the Department of City Planning Hillside Area Map (12.21A.17), which can be viewed on NavigateLA. The area where construction projects are subject to the “Baseline Hillside Ordinance."
A soils report is needed for construction on a slope steeper than 3:1 (Horizontal:Vertical), excavations removing lateral support, when a structure cannot be designed per building code values, and/or for structures which do not conform to chapter 18 of the 2014 LABC.
When do I need a soils, a geology, or a combined soils and geology report?
A geology report is needed for development within an Alquist-Priolo Earthquake Fault Zone or a Preliminary Fault Rupture Study Area or for new onsite wastewater treatment systems (OWTS).A combined report is needed for projects in a Hillside Grading Area or where bedrock is encountered in addition
When grading plans are reviewed by regular plan check or grading plan check?
A building plan checker reviews most grading plans. The grading plan checker will review grading plans for grading work in conjunction with an approved subdivision map or to issue grading permits to correct a hazardous soil condition per LABC 7005.7.