Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF BUILDING ON AIR SPACE LOTS
AFF-B-003
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF BUILDING SUPPORT
AFF-B-004
AFFIDAVIT OF INDEMNIFICATION FOR SELF-CERTIFIED TENANT IMPROVEMENT PROJECTS
AFF-B-006
COVENANT AND AGREEMENT REGARDING DRAINAGE EASEMENT (SINGLE OWNERSHIP)
AFF-B-007
COVENANT AND AGREEMENT REGARDING DRAINAGE EASEMENT (SEPARATE OWNERSHIP)
AFF-B-008
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF YARDS FOR AN OVER-SIZED BUILDING
AFF-B-009
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF SUMP PUMP AND NATURAL GAS/PROPANE-POWERED “BACK-UP” GENERATOR SYSTEM
AFF-GR-003
Filtered categories:
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF BUILDING ON AIR SPACE LOTS
AFF-B-003
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF BUILDING SUPPORT
AFF-B-004
AFFIDAVIT OF INDEMNIFICATION FOR SELF-CERTIFIED TENANT IMPROVEMENT PROJECTS
AFF-B-006
COVENANT AND AGREEMENT REGARDING DRAINAGE EASEMENT (SINGLE OWNERSHIP)
AFF-B-007
COVENANT AND AGREEMENT REGARDING DRAINAGE EASEMENT (SEPARATE OWNERSHIP)
AFF-B-008
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF YARDS FOR AN OVER-SIZED BUILDING
AFF-B-009
COVENANT AND AGREEMENT REGARDING MAINTENANCE OF SUMP PUMP AND NATURAL GAS/PROPANE-POWERED “BACK-UP” GENERATOR SYSTEM
AFF-GR-003
Filtered categories:
Existing Escalator Clearance Between the Skirt and the Step
IB/P/EV 2002-001
- Effective
Exit illumination and Exit Sign Lighting Systems
IB/P/BC 2023-019
- Effective
Express Permits (No Plan Check Required)
IB/P/GI 2026-003
- Effective