Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
How far should my accessory building be from my house?
Any accessory building shall observe 10 feet separation from the main dwelling unit or any Accessory Living Quarters on the property.
How high can my building be?
A height of a building is limited per the zoning designation of the property. Visit a LADBS office Zoning counter for more information. A building code also limits the height of a building based on the type of construction and the occupancy of the building. Your building will need to comply with the lost restrictive height of the zoning and the building codes.
How high my fence can be?
A fence within the required front yard setback for a property is limited to 3.5 feet above the natural grade. The fence height within the required setbacks other than the front yard setbacks could be limited to 6 feet or 8 feet based on the location of the property. A fence in the Special Grading Area of the City is limited to 6 feet above the natural grade within the required side or the rear yard. Check the zoning for your property to see if it is located within the Special Grading Area.
How large my accessory building can be?
The total floor areas of all the accessory buildings on a property can not be larger than the floor area of the main dwelling unit.
How late can I schedule an inspection?
You can schedule an inspection for the next day, so long as you do so before 2:00 PM, subject to availability.
How long a Permit extension is good for?
Each permit extension is good for 6 months.
How long a Plan Check extension is good for?
Please refer to the Information Bulletin P/BC 2023-120 for the Policy for Plan Check Time Extension.
How long a Plan Check is good for?
A Plan Check is good for 18 months from the time the plan check fees are paid.
How long does it take to obtain LADBS-ETL approval for a product?
Depending upon the labs backlog, it would take about 10 to 15 days for a lab application, and 15 to 20 days for a General Approval (Research Report) to be assigned. After assignment, it would generally take about one to two weeks to get a response. The overall completion of the evaluation and approval depends on the applicant. If the applicant is able to provide a test sample for initial and subsequent reevaluation, submit all the required information and documentations through the evaluation process, the complete process including the test lab evaluation and testing would generally be between 1 to 5 months to get an approval.
How long does it take to obtain LADBS-MTL approval for a product?
It depends on the backlog at the time the application is submitted. The backlog information is provided to applicants at the time of submittal. The backlog is the time it takes to assign an application and report to an LADBS-MTL engineer to be processed from the submittal date. If there are any corrections, it will be up to the applicant to address the corrections in a timely manner.