Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
How long is the approval good for, and where do I find it?
A General Approval/Laboratory Approval is valid for one year from the approval date.
How long is the approval good for, and where do I find it?
The general and laboratory approval is good for 12 months. The product approval letter indicates the duration and expiration date of the approved product.
One-time approval is good for the duration where the equipment is installed, provided that the equipment is not modified or relocated to another location in or outside of the building or facility.
How long will it take for my application to be processed?
The process time depends on the current backlog and type of application submitted. Contact the Mechanical Test Lab Engineer for more information. You may find test lab contact information on our Mechanical Test Lab page.
How long will it take to get a plan check?
The amount time needed to check a plan will vary week to week based on the day's backlog at the time of submittal. You may ask any available staff about the current backlog and a time estimate.
How long will it take to get my report reviewed?
Regular: 5 to 6 weeks. Expedite: 4 to 5 weeks.
How many DA parking spaces are required for guests?
5% minimum is required.
How many DA parking spaces are required for tenants?
2% of the dwelling units. If parking is assigned, then 2% of the assigned parking spaces must be accessible. If unassigned, then a minimum of 5% of parking spaces must be accessible.
How many DA parking stalls are required?
DA parking stalls must be provided in accordance with Table 11B-208.3.
How many DA seats are required for a restaurant?
Minimum 5% of the seating spaces for dining surfaces must be accessible and dispersed within other types of seating located in the functional area.
How many dwelling units can I add or build before DA requirements kick in?
Addition of 3 or more newly-constructed units will trigger DA requirements.
Filtered categories:
Filtered categories: