Building Research Section (BRS)
The BRS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Additional Information
Approved materials are published as Los Angeles Research Reports (LARR).
The Building Research Section is located at our Metro location (201 N Figueroa St, Rm 880, Los Angeles, CA 90012)
LA Research Reports (LARR)
LADBS approves alternate building materials or products that are at least equivalent to the materials prescribed in the code in terms of quality, effective time period of fire resistance, strength, effectiveness, durability and safety.
Approved materials are published as Los Angeles Research Reports (LARR).
Additional Resources
- FAQ
- Applications
- Publications
FAQ Search Results
Filtered categories:
All
Can I request records over the phone?
No, but a fax request may be sent.
Can I sale, install or use unlisted electrical products in the City of Los Angeles?
According to the City of Los Angeles Electrical Code section 93.0402, as well as section 110.2 of the State of California and National Electrical Code, only the conductors and equipment required or permitted (by the code) are acceptable when they are approved.
If an unlisted electrical product is inadvertently installed in the City of Los Angeles, the installer can request for a field evaluation of the product from the City of Los Angeles Electrical Test Lab or from a recognized testing agency, however, the equipment would not be permitted to be energized to operate until either an approval is obtained from the Electrical Test Lab, or an acceptable field evaluation by a recognized test lab is completed and a satisfactory report is submitted to the Department electrical inspection in order to obtain approval from them.
Can I select more than one inspection type?
Yes. You may select as many inspection types as you wish. Please limit your selection(s) to work that is ready to be inspected.
Can I start work before I obtain my permit?
No, work cannot be started until a valid permit is issued.
Can I submit more than one plan file?
No, all plan sheets must be combined into one PDF document.
Can I submit my plans online for Plan Check?
If your plans qualify for electronic plan check service, you may submit online through ePlanLA.
Can I use ABS pipe in a residential building?
Plastic waste and vent piping in residential occupancies are allowed when the residential portion of the building is 2 stories or less.
Can I use a Commercial Coach on my property?
Yes, but with some exceptions. Please see the Information Bulletin P/BC 2023-079 for more details.
Can I use any products in LA City?
For non-structural items, an ICC report is acceptable. For structural elements, you will need a LA Research Report. See the Information Bulletin P/BC 2014-119.
Can I use a slope of less than 1% for rain water piping?
No, since the pipe sizing tables for rain rainwater are based on a minimum 1% slope.
Filtered categories:
Filtered categories: